Today we are open from 09.00 to 22.00
About us

About us

Content Project Construction Investors
Aria

Content

In the Aria Mall, you may visit shops of well-known brands. Within this unique facility in the very downtown, you may also find a supermarket, beauty salon, hairdresser salon, kids playroom, as well as enjoy the specialties of our restaurant, take a break with sweets or salty meals on the Food Court, and have refreshments in cafés.

During your stay in the Center, you may leave your car in one of the 464 parking lots under video surveillance set over three underground levels.

A section of the Aria Mall includes modern and sophisticated office premises disposed up to the 10th floor.

1665821456-sadrzaji.jpg

Once the shopping fever is over and you wish to have some good time outside, the square in front of the Aria Mall comprising an area of around 5.500 m2, is the perfect opportunity for an open air relaxation, since it was completely furnished with the urban accessories (sitting benches, flower pots, illumination, fountain).

The square is a meeting place of the citizens of Sarajevo where, in organization of the Aria Mall, artistic performances, kids playgroups and workshops, concerts, promotions, sports competitions and like, take place.

The Company “Central Park Real Estate” d.o.o. Sarajevo, as the investor, is responsible for development and concept of the Aria Mall, which Company is founded and owned by Islamic Development Bank.

1665821667-sadrzaji-ii.jpg
Aria

Project

Autor projekta Aria Mall je Grupa ARH d.o.o. Sarajevo, na čelu sa glavnim projektantom Seadom Gološem. Osnovni koncept objekta Aria Mall je galerija – otvoreni prostor, prostor za izložbu sa kvalitetnim dnevnim svjetlom, u kojem su izložene razne robe i brandovi, umjetnine ili pak usluge i servisi interesantni posjetiteljima. Prozračni prostor vidljiv je s vana iz perspektive pješaka prolaznika. Cilj je bio funkcionalno i vizuelno povezivanje vanjskog i unutarnjeg prostora.

Aria Mall opremljen je savremenim Sistemom za centralni nadzor i upravljanje. Pokretne trake i pokretne stepenice kao i tri brza panoramska lifta namijenjena su posjetiteljima shopping zone, a tri bočna brza lifta korisnicima uredskog dijela Aria Mall.

1669215847-projekat.jpg

Zakupcima su na raspolaganju i servisni liftovi. Aria Mall je opskrbljen najsavremenijim sistemima klimatizacije i ventilacije, grijanja, besprekidnim napajanjem električnom energijom, protivpožarnim i vatrodojavnim sistemom, kao i videonadzorom i fizičkim osiguranjem.

Prodajni i ugostiteljski prostori u Aria Mall uređeni su prema potrebama i željama korisnika prostora odnosno u skladu sa standardima i zahtjevima njihovih kompanija i partnera. Uredski prostori opremljeni su svim instalacijama potrebnim za savremeno poslovanje uključujući telefonski sistem, računarsku mrežu, internet konekcije, adekvatnu rasvjetu, sistem ozvučenja za distribuciju TV i radio programa...

1669215906-projekat-ii.jpg
Aria

Construction

Projekat izgradnje Aria Mall trajao je od je 2006. do 2009. i podrazumijevao je više složenih faza, od rušenja objekta “Sarajke” u samom centru grada, preko izvođenja građevinske jame tehnologijom koja je po prvi put tada primijenjena u BIH, grubih građevinskih radova, instalacija, te do uređenja enterijera.

Rušenje bivše robne kuće „Sarajka“

Rušenje objekta bivše Robne kuće „Sarajka“ do kote +/-0,00 izvedeno je od strane firme „Unigradnja“ d.d. Sarajevo, a nadzor nad radovima vršila je firma „Kubus“ d.o.o. Sarajevo.

Budući da se radilo o rušenju velikog objekta u centru gradske zone, važno je istaći da je cjelokupni posao obavljen bez ikakve štete po okolne objekte te u skladu sa relevantnim propisima i standarima.

1665823267-izgradnja.jpg

Izvođenje građevinske jame

Za izradu zaštitne konstrukcije građevinske jame na objektu „Aria Mall“ korištena je tehnologija koja je po prvi put tada primijenjena u Bosni i Hercegovini. Armirano-betonski šipovi, čija je dubina bila i do 14,5 metara, postavljeni su u razmaku 3 m, a na vrhu su povezani armirano-betonskom gredom.

Kompletno lice građevinske jame je obloženo torkretom. Na ovaj način je ostvarena maksimalna sigurnost po okolne objekte, te je spriječen dotok vode prilikom iskopa za tri podzemne etaže.

1665823335-izgradnja-ii.jpg

Građevinski i instalacijski radovi

U rekordnom roku završena je kompletna betonska konstrukcija sa ugrađenim cca 25.000 m3 betona i 3.3 tone armaturnog čelika, 183 tone čelika za čeličnu konstrukciju.

Po prvi put na prostorima BiH upotrijebljen je sistem Volumenske hidroizolacije firme Schomburg/Rethmeier koja uslove vodonepropusnosti postiže dodavanjem tečnog kristalizirajućeg sredstva u svježe pripremljenu betonsku smjesu. Ovaj metod omogućuje brže betoniranje podzemnog dijela konstrukcije i u zimskim uslovima dok istovremeno postiže veći faktor zaštite od prodora podzemnih voda.

1665823366-izgradnja-iii.jpg

Uređenje enterijera

U objekat su ugrađeni najkvalitetniji materijali. Zakupci u Aria Mall dobili su priliku da sami uređuju prodajne i ugostiteljske prostore prema svojim potrebama i u skladu sa standardima i zahtjevima njihovih kompanija i partnera, a u smislu organizacije prostora, odabira materijala, ugradnje rasvjete itd.

Osim toga posebnu čar objektu daje posebno riješen projekat vizualnih komunikacija, 20 LCD Displaya, te vrhunsko ozvučenje i rasvjeta.

1669215964-izgradnja-iv.jpg